Pipeline logo
Project image

Eco-Smart

0/9
DPG Standards
sdg-category
$0
raised of $50.0K
0
updates

Contributors

Last modified: 1 week ago

Eco-Smart reimagines climate action by putting powerful, localized information and decision-making tools directly in the hands of the most vulnerable urban and rural families, youth, and low-income communities who are often left out of traditional disaster warning systems and policy conversations.

DPG Compliance Assessment

Detailed evaluation against Digital Public Good standards

0/9
Standards Complete

Action Required (9 remaining)

Overall Assessment

CRITICAL BLOCKER: This repository is completely empty and cannot be considered for DPG status in its current state. The GitHub repository exists but contains zero commits, zero files, and zero code. Before any DPG evaluation can meaningfully proceed, the following must be completed: **Phase 1 - Essential Foundation (Weeks 1-2):** 1. Push actual working code to the repository 2. Add LICENSE file (recommend MIT or Apache 2.0) 3. Create README.md with project description and basic setup instructions 4. Add AUTHORS.md or copyright statements documenting ownership 5. Implement core features that address specific SDG goals **Phase 2 - Basic Compliance (Weeks 3-4):** 1. Add comprehensive documentation (installation, configuration, usage) 2. Create PRIVACY.md if handling user data 3. Implement basic testing (unit tests for core functionality) 4. Set up CI/CD pipeline (GitHub Actions) 5. Add CODE_OF_CONDUCT.md **Phase 3 - DPG Readiness (Weeks 5-8):** 1. Ensure platform independence (avoid vendor lock-in) 2. Implement data export features if applicable 3. Add security measures and privacy controls 4. Achieve >70% test coverage 5. Implement harm prevention measures appropriate to app type 6. Document standards and best practices followed **Current Status:** 0/9 criteria passed. The project is not ready for DPG evaluation. **Estimated Timeline to DPG Readiness:** 12-16 weeks of active development, assuming a small team working on a focused application. **Next Immediate Steps:** 1. Contact project owner (babae19) to understand project status 2. Determine if this is an abandoned repository or pending initial commit 3. Clarify project scope and intended functionality 4. Establish development roadmap with DPG criteria in mind

0 Complete
9 Remaining
0% Complete